Installation
HOA PHAT COKE COAL PRODUCTION & THERMAL POWER PLANT
HOA PHAT COKE COAL PRODUCTION & THERMAL POWER PLANT |
Address: Hiep Son Commune, Kinh Mon District, Hai Duong Province Owner: Hoa Phat Energy Joint Stock Company Total contract value: 4,547,400,022 VND Contractor’s scope of works: installing system of Coke boiler casings and roofing for phase 2 of Hoa Phat energy Joint Stock Company including: - Installing 01 system of Coke boiler casings including entire steel structures, casted steel with refractory materials, hot air duct. - Fabricating support frame for center flue gas duct - Installing roof rafters - Roofing General information about the project: Hoa Phat Coke coal production and thermal-power plant is constructed on March 25th, 2008 with the total investment capital for both 2 phases nearly 2,000 billions VND, the design capacity is 700,000 tons of Coke coal per year. The factory was operated stably for phase 1 and has been under construction for phase 2 expected to be finished in mid-2011. In the contractor’s scope of works, LISEMCO 2 undertakes installing Coke boiler casings in compliance with designed documents and technical description approved by designer and owner. |
Tin nổi bật
-
Lễ hạ thủy tổ hợp Module chuyến 02 (Batch #4) dự...
Ngày 17/10/2024
-
Amecc tham gia Hội nghị kỷ niệm 20 năm ngày doanh nhân...
Ngày 13/10/2024
-
Tổ chức lễ kết nạp Đảng viên cho hai đồng chí...
Ngày 06/10/2024