HOA PHAT COKE COAL PRODUCTION & THERMAL POWER PLANT
HOA PHAT COKE COAL PRODUCTION & THERMAL POWER PLANT |
Address: Hiep Son Commune, Kinh Mon District, Hai Duong Province Owner: Hoa Phat Energy Joint Stock Company Total contract value: 4,547,400,022 VND Contractor’s scope of works: installing system of Coke boiler casings and roofing for phase 2 of Hoa Phat energy Joint Stock Company including: - Installing 01 system of Coke boiler casings including entire steel structures, casted steel with refractory materials, hot air duct. - Fabricating support frame for center flue gas duct - Installing roof rafters - Roofing General information about the project: Hoa Phat Coke coal production and thermal-power plant is constructed on March 25th, 2008 with the total investment capital for both 2 phases nearly 2,000 billions VND, the design capacity is 700,000 tons of Coke coal per year. The factory was operated stably for phase 1 and has been under construction for phase 2 expected to be finished in mid-2011. In the contractor’s scope of works, LISEMCO 2 undertakes installing Coke boiler casings in compliance with designed documents and technical description approved by designer and owner. |
| |||||||||
Tin nổi bật
-
-
AMECC tổ chức chuyến du lịch nghỉ dưỡng tại Trà...
Ngày 08/07/2025
-
-
AMECC Tham Dự Lễ Kỷ Niệm 10 Năm GKM Group và Hội...
Ngày 27/06/2025
-
-
Đảng Bộ Công Ty Cổ Phần Cơ Khí Xây Dựng AMECC...
Ngày 20/06/2025