Installation
SUCCESSFULL INSTALLATION OF AIR DUCT AND FLUE GAS DUCT SYSTEMS-VUNG ANG 1 THERMAL POWER PROJECT
SUCCESSFULL INSTALLATION OF AIR DUCT AND FLUE GAS DUCT SYSTEMS UNIT 2- VUNG ANG 1 THERMAL POWER PROJECT |
On Vung Ang 1 thermal power plant site, two superb & high sky boiler houses rose with zigzag air duct and flue gas duct system, look like a giant respiratory system of the Plant. I stand in front of Boiler house No 2, look up to the air duct and flue gas duct system, and remember about the hard days those the welders & erectors of LISEMCO 2 gone through, when installing all air duct and full gas duct systems for the Unit 2, under the very severe weather of the sunny & burnt middle land. The drops of perspiration fall, the tanned skin left, it is the time to get working result. Particularly, all air duct and full gas duct systems for the Unit 2 (with pre-calculated quantity is 1200 tons) have been installed successfully, inspected and accepted by the Owner, for executing next work items. At sunset, it is the time we have to say good bye, the picture of LISEMCO 2’s workers with radiant smile on their sunburnt faces will be remained forever in our mind. Vung Ang, on 18/8/2012 By: Hong Ha |
Tin nổi bật
-
Amecc gia công và chuyển giao lắp đặt thành công dầm...
Ngày 22/04/2024
-
Hiện đại hóa sản xuất: Trạm hàn dầm tự động...
Ngày 29/03/2024
-
Chào mừng Ngày Quốc tế Phụ nữ tại Công ty Amecc:...
Ngày 08/03/2024