SUCCESSFULL INSTALLATION OF AIR DUCT AND FLUE GAS DUCT SYSTEMS-VUNG ANG 1 THERMAL POWER PROJECT

On Vung Ang 1 thermal power plant site, two superb & high sky boiler houses rose with zigzag air duct and flue gas duct system, look like a giant respiratory system of the Plant...

SUCCESSFULL INSTALLATION OF AIR DUCT AND FLUE GAS DUCT SYSTEMS

 

UNIT 2- VUNG ANG 1 THERMAL POWER PROJECT

On Vung Ang 1 thermal power plant site, two superb & high sky boiler houses rose with zigzag air duct and flue gas duct system, look like a giant respiratory system of the Plant.

 

I stand in front of Boiler house No 2, look up to the air duct and flue gas duct system, and remember  about  the hard days those the welders & erectors of LISEMCO 2 gone through, when installing all air duct and full gas duct systems for the Unit 2, under the very severe weather of the sunny & burnt middle land.

 

The drops of perspiration fall, the tanned skin left, it is the time to get working result. Particularly, all air duct and full gas duct systems for the Unit 2 (with pre-calculated quantity is 1200 tons) have been installed successfully, inspected and accepted by the Owner, for executing next work items.

 

At sunset, it is the time we have to say good bye, the picture of  LISEMCO 2’s workers  with radiant smile on their sunburnt faces will be remained forever in our mind.

 

Vung Ang, on 18/8/2012