ẢNh đại diện

Fabrication

Fabrication

EXECUTION PROGRESS OF IHI PROJECT

On October 10th 2013, Lisemco 2 Joint stock company signed a contract with IHI Asia Pacific Corporation (Japan) in fabricating and exporting air duct and gas pipe for thermal power plant project Cochrane in Chile. The volume is 1,194.3 tons. After signing contract, Lisemco 2 concentrated on all resources to implement project in order to meet technical requirements as well as schedule proposed by customers. In executing period, Lisemco 2 has certain difficulties such as technical...

 

EXECUTION PROGRESS OF IHI PROJECT

 

On October 10th 2013, Lisemco 2 Joint stock company signed a contract with IHI Asia Pacific Corporation (Japan) in fabricating and exporting air duct and gas pipe for thermal power plant project Cochrane in Chile. The volume is 1,194.3 tons. After signing contract, Lisemco 2 concentrated on all resources to implement project in order to meet technical requirements as well as schedule proposed by customers.

In executing period, Lisemco 2 has certain difficulties such as technical requirements of complex product structures using much manpower and it is difficult to transport some types of equipment and products in large size. Although there are many difficulties, all staffs in Lisemco 2 tried their best in manpower as well as equipment to improve awareness and responsibilities, determine to execute the contract in right schedule  

 

After more than six months of executing, schedule requirement are always concerned by Lisemco 2. Technical accuracy is put on the top of priority by engineers and workers. So up to now, almost 50% of work volume has been completed. Customers’ satisfaction is fulfilled with belief smile.

Hai Phong, on 23rd Jun 2014

By: Huyen Trang

Chia sẻ