Fabrication
LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT
Being the fabrication contractor of Thai Binh 2 thermal power plant with design capacity of 1.200 MW with total design capacity of 1,200 MW with total investment capital of VND 34,295, equaling USD 1.7 at My Loc Commune, Thai Thuy district, Thai Binh province, LISEMCO 2 JSC is in charge of fabrication of around 9000 tons of steel structure of Turbine house and Central control building of the plant.
At present, LISEMCO 2 is urgently the fabrication work, trying to complete the work earlier than the intended time schedule of the project. Up to now, LISEMCO 2 completed painting and packing work of 6,525 tons of steel structure among around 9000 tons, and continuously delivering to the site. |
Beside, other projects are executing, meeting the time schedule and technical and specification of the Owner. Facing the temperature up to 35oC, but the staffs of Company still show their determination for well execution of such as safety, quality, time schedule exceeding, as well as production plan of the year 2015, that is VND 760 billion. Hai Phong, on 1 Jun.2015 By: Thanh Tu |
Tin nổi bật
-
Lễ hạ thủy tổ hợp Module chuyến 02 (Batch #4) dự...
Ngày 17/10/2024
-
Amecc tham gia Hội nghị kỷ niệm 20 năm ngày doanh nhân...
Ngày 13/10/2024
-
Tổ chức lễ kết nạp Đảng viên cho hai đồng chí...
Ngày 06/10/2024