Repair & Maintenance
TURBINE INTERMEDIATE REPAIR AT UONG BI THERMAL POWER PLANT
For executing periodical repair plan of Uong Bi thermal power plant, in September 2011 LISEMCO 2 continuously signed two contracts with Uong Bi Thermal Power Co., Limited, on: Newly install slag pumping system for boiler, and intermediate repair for turbine and its auxiliary equipments of the 300 MW unit at Uong Bi Thermal Power Plant, Quang Ninh province, Vietnam.
These are two of contract series on installation, maintenance, and repair for Uong Bi Thermal Power Plant, have been executing by LISEMCO 2. Continuously contract signing with the partner confirms high belief on LISEMCO 2’s workers on repair, maintenance at big industrial plant at Vietnam.
Tin nổi bật
-
-
AMECC KHỞI CÔNG DỰ ÁN UAE TA’ZIZ METHANOL – KHẲNG...
Ngày 30/03/2026
-
-
Thông báo lịch nghỉ Tết Nguyên Đán Bính Ngọ 2026
Ngày 27/01/2026
-
-
Công đoàn công ty Amecc tổ chức chúc mừng sinh nhật...
Ngày 29/12/2025




