ẢNh đại diện

Fabrication

AMECC MANUFACTURES SHIP SCRUBBERS

AMECC MANUFACTURES SHIP SCRUBBERS

Ngày: 21-03-2020 | Lượt xem: 827

On 02/28/2020 AMECC handed over the second batch of Scrubbers at Hai Phong port to Bilfinger Engineering & Technologies GmbH.

Xem thêm
AMECC MANUFACTURES SCRUBBERS

AMECC MANUFACTURES SCRUBBERS

Ngày: 26-06-2019 | Lượt xem: 913

Following a series of contract on manufacturing and fabrication for foreign projects, on 14 June 2019, AMECC Mechanical Construction Joint Stock Company signed a contract with Bilfinger Engineering & Technologies GmbH on manufacturing of Scrubbers.

Xem thêm
AMECC JSC WITH MOKA TANK PROJECT

AMECC JSC WITH MOKA TANK PROJECT

Ngày: 22-09-2017 | Lượt xem: 849

Project: Moka Tank Owner: KOKELCO Contractor: ENEXIO – Federal Republic of Germany

Xem thêm
AMECC JSC HAS COMPLETED THE DINH RIVER DOWNSTREAM DAMP  PROJECT

AMECC JSC HAS COMPLETED THE DINH RIVER DOWNSTREAM DAMP PROJECT

Ngày: 19-09-2017 | Lượt xem: 993

Project: Dinh River Downstream Dam project Location: Phan Rang – Thap Cham City and Ninh Phuoc district, Ninh Thuan Province. Owner: Water Resources Branch – Agriculture and Rural Development Department of Ninh Thuan Province Main contractor: Consortium of Southern Minerals Joint Stock Company No.389, Hassyu Vietnam Joint Stock Company and Bridge Joint Stock Company No.14.

Xem thêm
AMECC EXCELLENT COMPLETED THE WORK OF JIMAH EAST POWER PROJECT AS TIME SCHEDULE

AMECC EXCELLENT COMPLETED THE WORK OF JIMAH EAST POWER PROJECT AS TIME SCHEDULE

Ngày: 11-09-2017 | Lượt xem: 1080

On August 30, 2017, Amecc Mechanical Construction JSC exported the cargo of Jimah East power project.

Xem thêm
LG INNOTEK PLANT PROJECT IN HAI PHONG

LG INNOTEK PLANT PROJECT IN HAI PHONG

Ngày: 11-02-2017 | Lượt xem: 1282

WORK SCOPE OF AMECC: Fabrication and installation of steel structure for the whole plant...

Xem thêm
DUYEN HAI 3 EXTENSION THERMAL POWER PLANT PROJECT

DUYEN HAI 3 EXTENSION THERMAL POWER PLANT PROJECT

Ngày: 09-02-2017 | Lượt xem: 1372

WORK SCOPE OF AMECC: Fabrication of CW supply piping system. Fabrication of tanks, coal silos, ducts... ...

Xem thêm
NAMAN BRIDGE OF LAOS NR-6B ROAD PROJECT

NAMAN BRIDGE OF LAOS NR-6B ROAD PROJECT

Ngày: 08-02-2017 | Lượt xem: 913

WORK SCOPE OF AMECC: Fabrication, transportation and installation of Naman bridge in Sopbao village. ...

Xem thêm
CHANGI T2R PROJECT– CHANGI AIRPORT

CHANGI T2R PROJECT– CHANGI AIRPORT

Ngày: 08-02-2017 | Lượt xem: 795

Work scope: Fabrication of passenger loading bridge for Changi airport...

Xem thêm
THAI BINH 2 COAL- FIRED THERMAL POWER PROJECT

THAI BINH 2 COAL- FIRED THERMAL POWER PROJECT

Ngày: 07-02-2017 | Lượt xem: 761

Work scope: Fabrication of steel structures of Turbine house and CCB. ...

Xem thêm
COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION  FOR THAI BINH 2 TPP PROJECT

COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT

Ngày: 12-12-2016 | Lượt xem: 978

Yesterday, on September 19th, Lisemco 2 Joint Stock Company is solemnly organized a commencement ceremony for steel structure fabrication of turbine house and central controlling building belonging to Thai Binh 2 Thermal Power Project

Xem thêm
LISEMCO 2 SIGNED A CONTRACT ON FABRICATION WORK OF FORMOSA HA TINH PROJECT

LISEMCO 2 SIGNED A CONTRACT ON FABRICATION WORK OF FORMOSA HA TINH PROJECT

Ngày: 12-12-2016 | Lượt xem: 679

On 08/August/2013, LISEMCO 2 JSC signed contracts with Posco E & C Vietnam on steel structure fabrication work of the complex “Cast iron & steel plant and Son Duong deep-water port” Formosa- Ha Tinh.

Xem thêm
LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT

LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT

Ngày: 12-12-2016 | Lượt xem: 863

Being the fabrication contractor of Thai Binh 2 thermal power plant with design capacity of 1.200 MW with total design capacity of 1,200 MW with total investment capital of VND 34,295, equaling USD 1.7 at My Loc Commune, Thai Thuy district, Thai Binh province, LISEMCO 2 JSC is in charge of fabrication of around 9000 tons of steel structure of Turbine house and Central control building of the plant.

Xem thêm