ẢNh đại diện

Fabrication

COCHRANE THERMAL POWER PLANT - CHILE

COCHRANE THERMAL POWER PLANT - CHILE

Ngày: 23-07-2016 | Lượt xem: 727

Work scope: Supply, fabrication of steel structures, air ducts, flue gas ducts and export to Chile...

Xem thêm
DAP 2 PLANT-LAO CAI

DAP 2 PLANT-LAO CAI

Ngày: 23-07-2016 | Lượt xem: 591

Work scope: Fabrication & installation of steel structure, silo, stack structure, vessel…

Xem thêm
NOI BAI INTERNATIONAL AIRPORT EXTENSION

NOI BAI INTERNATIONAL AIRPORT EXTENSION

Ngày: 23-07-2016 | Lượt xem: 744

Fabrication of Passenger Boarding Bridges of Noi Bai International Airport, for ShinMaywa- Japan...

Xem thêm
MONG DUONG 1 THERMAL POWER PROJECT

MONG DUONG 1 THERMAL POWER PROJECT

Ngày: 23-07-2016 | Lượt xem: 695

Work scope: Supply, fabrication, installation of high pressure pipings, silos, bins, hoppers, tanks, steel structures, temporary houses…

Xem thêm
BARH SUPER THERMAL POWER PLANT

BARH SUPER THERMAL POWER PLANT

Ngày: 23-07-2016 | Lượt xem: 613

Work scope in this project: Fabrication, manufacture of air ducts, flue gas ducts, steel structures, non-standard equipments for this Project and export them to India. ...

Xem thêm
PHU THO ETHANOL PLANT

PHU THO ETHANOL PLANT

Ngày: 23-07-2016 | Lượt xem: 512

Scope of work: Fabricating and installing steel structures basing on approved drawings...

Xem thêm
SON LA HYDRO-POWER PLANT

SON LA HYDRO-POWER PLANT

Ngày: 23-07-2016 | Lượt xem: 718

Total investment capital: 42,476,9 billions VND, Capacity: 2,400 MW consisting 6 Units...

Xem thêm
COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION OF TURBINE HOUSE AND C.C.B OF THAI BINH 2 THERMAL POWER PROJECT

COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION OF TURBINE HOUSE AND C.C.B OF THAI BINH 2 THERMAL POWER PROJECT

Ngày: 14-06-2016 | Lượt xem: 530

Yesterday, on September 19th, Lisemco 2 Joint Stock Company is solemnly organized a commencement ceremony for steel structure fabrication of turbine house and central controlling building belonging to Thai Binh 2 Thermal Power Project Thai Binh 2 Thermal Power Project is invested and built with capacity 1,200 MW, total investment up to 34,295 billion Vietnam dongs. Each year, this project will produce 6,739 billion KWH. This is a project of Vietnam Oil and Gas Group (PVN) as an...

Xem thêm
AMECC WITH JIMAH EAST POWER PROJECT

AMECC WITH JIMAH EAST POWER PROJECT

Ngày: 20-05-2016 | Lượt xem: 542

On the date of 17-May-2016, AMECC signed the Order with Hyundai Rotem Korea for manufacturing tower, surge bin and sub structure for Jimah East Coal-Fired Power Project 2x1000 MW This is not the first time AMECC cooperates with Hyundai, in the past time AMECC (when it is JSC LISEMCO 2) signed several orders with Hyundai, especially order for the CHS and LHS systems of Mong Duong 1 thermal power plant, with the order value is USD 6,220,185, ensued quality, met time schedule, satisfied high...

Xem thêm
LISEMCO 2 – DUYEN HAI 3 EXTENSION THERMAL POWER PROJECT

LISEMCO 2 – DUYEN HAI 3 EXTENSION THERMAL POWER PROJECT

Ngày: 08-04-2016 | Lượt xem: 631

After continuously signed several contracts on fabrication and installation for the Thai Binh 1&2 Thermal Power projects, LISEMCO 2 continues to sign contracts with several new projects in the field of fabrication and installation of structural steel and equipment for industrial plants. One of the new projects is Duyen Hai 3 Thermal Power Plant. LISEMCO 2 Contractor signed 2 contracts for this project, namely: · Contract on Dry coal...

Xem thêm
NGHI SON NAVIGATION LEADING LIGHTS COLUMN PROJECT WITH THE HANDS OF LISEMCO 2 WORKERS

NGHI SON NAVIGATION LEADING LIGHTS COLUMN PROJECT WITH THE HANDS OF LISEMCO 2 WORKERS

Ngày: 30-10-2015 | Lượt xem: 471

On July 27th, 2015, Lisemco2 signed the contract with Vietnam maritime safety North to fabricate and erect the leading lights in Nghi Son port. Weight is over 50 tons. Leading light is a signal column including two leading lights. They create fixed direction. They notice ships about navigable party and ships can determine position of obstacles. This is a project related to National technical standards...

Xem thêm
LISEMCO 2 CONTINUES SUCCESS AT BRIDGESTONE PROJECT – DINH VU

LISEMCO 2 CONTINUES SUCCESS AT BRIDGESTONE PROJECT – DINH VU

Ngày: 17-09-2015 | Lượt xem: 472

On March, 2015, Lisemco 2 Joint Stock Company signed the contract with Hitachi Plant Technologies about: Fabricating, painting, installing and insulation works of pipe system in Power house , belonging to Bridgestone Project Dinh Vu Hai Phong. In this project, Lisemco 2 have to fabricate 16,610 ID, insulate 15,744 B x M with schedule in 5 months. On April 20th,2015, Enterprise Lisemco 2-3 conducted to receive materials. All above...

Xem thêm
LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION OF THAI BINH 2 THERMAL POWER PROJECT

LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION OF THAI BINH 2 THERMAL POWER PROJECT

Ngày: 01-06-2015 | Lượt xem: 495

Being the fabrication contractor of Thai Binh 2 thermal power plant with design capacity of 1.200 MW with total design capacity of 1,200 MW with total investment capital of VND 34,295, equaling USD 1.7 at My Loc Commune, Thai Thuy district, Thai Binh province, LISEMCO 2 JSC is in charge of fabrication of around 9000 tons of steel structure of Turbine house and Central control building of the plant....

Xem thêm