Fabrication
-
COCHRANE THERMAL POWER PLANT - CHILE
Ngày: 23-07-2016 | Lượt xem: 727Work scope: Supply, fabrication of steel structures, air ducts, flue gas ducts and export to Chile...
Xem thêm
-
DAP 2 PLANT-LAO CAI
Ngày: 23-07-2016 | Lượt xem: 591Work scope: Fabrication & installation of steel structure, silo, stack structure, vessel…
Xem thêm
-
NOI BAI INTERNATIONAL AIRPORT EXTENSION
Ngày: 23-07-2016 | Lượt xem: 744Fabrication of Passenger Boarding Bridges of Noi Bai International Airport, for ShinMaywa- Japan...
Xem thêm
-
MONG DUONG 1 THERMAL POWER PROJECT
Ngày: 23-07-2016 | Lượt xem: 695Work scope: Supply, fabrication, installation of high pressure pipings, silos, bins, hoppers, tanks, steel structures, temporary houses…
Xem thêm
-
BARH SUPER THERMAL POWER PLANT
Ngày: 23-07-2016 | Lượt xem: 613Work scope in this project: Fabrication, manufacture of air ducts, flue gas ducts, steel structures, non-standard equipments for this Project and export them to India. ...
Xem thêm
-
PHU THO ETHANOL PLANT
Ngày: 23-07-2016 | Lượt xem: 512Scope of work: Fabricating and installing steel structures basing on approved drawings...
Xem thêm
-
SON LA HYDRO-POWER PLANT
Ngày: 23-07-2016 | Lượt xem: 718Total investment capital: 42,476,9 billions VND, Capacity: 2,400 MW consisting 6 Units...
Xem thêm
-
COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION OF TURBINE HOUSE AND C.C.B OF THAI BINH 2 THERMAL POWER PROJECT
Ngày: 14-06-2016 | Lượt xem: 530Yesterday, on September 19th, Lisemco 2 Joint Stock Company is solemnly organized a commencement ceremony for steel structure fabrication of turbine house and central controlling building belonging to Thai Binh 2 Thermal Power Project Thai Binh 2 Thermal Power Project is invested and built with capacity 1,200 MW, total investment up to 34,295 billion Vietnam dongs. Each year, this project will produce 6,739 billion KWH. This is a project of Vietnam Oil and Gas Group (PVN) as an...
Xem thêm
-
AMECC WITH JIMAH EAST POWER PROJECT
Ngày: 20-05-2016 | Lượt xem: 542On the date of 17-May-2016, AMECC signed the Order with Hyundai Rotem Korea for manufacturing tower, surge bin and sub structure for Jimah East Coal-Fired Power Project 2x1000 MW This is not the first time AMECC cooperates with Hyundai, in the past time AMECC (when it is JSC LISEMCO 2) signed several orders with Hyundai, especially order for the CHS and LHS systems of Mong Duong 1 thermal power plant, with the order value is USD 6,220,185, ensued quality, met time schedule, satisfied high...
Xem thêm
-
LISEMCO 2 – DUYEN HAI 3 EXTENSION THERMAL POWER PROJECT
Ngày: 08-04-2016 | Lượt xem: 631After continuously signed several contracts on fabrication and installation for the Thai Binh 1&2 Thermal Power projects, LISEMCO 2 continues to sign contracts with several new projects in the field of fabrication and installation of structural steel and equipment for industrial plants. One of the new projects is Duyen Hai 3 Thermal Power Plant. LISEMCO 2 Contractor signed 2 contracts for this project, namely: · Contract on Dry coal...
Xem thêm
-
NGHI SON NAVIGATION LEADING LIGHTS COLUMN PROJECT WITH THE HANDS OF LISEMCO 2 WORKERS
Ngày: 30-10-2015 | Lượt xem: 471On July 27th, 2015, Lisemco2 signed the contract with Vietnam maritime safety North to fabricate and erect the leading lights in Nghi Son port. Weight is over 50 tons. Leading light is a signal column including two leading lights. They create fixed direction. They notice ships about navigable party and ships can determine position of obstacles. This is a project related to National technical standards...
Xem thêm
-
LISEMCO 2 CONTINUES SUCCESS AT BRIDGESTONE PROJECT – DINH VU
Ngày: 17-09-2015 | Lượt xem: 472On March, 2015, Lisemco 2 Joint Stock Company signed the contract with Hitachi Plant Technologies about: Fabricating, painting, installing and insulation works of pipe system in Power house , belonging to Bridgestone Project Dinh Vu Hai Phong. In this project, Lisemco 2 have to fabricate 16,610 ID, insulate 15,744 B x M with schedule in 5 months. On April 20th,2015, Enterprise Lisemco 2-3 conducted to receive materials. All above...
Xem thêm
-
LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION OF THAI BINH 2 THERMAL POWER PROJECT
Ngày: 01-06-2015 | Lượt xem: 495Being the fabrication contractor of Thai Binh 2 thermal power plant with design capacity of 1.200 MW with total design capacity of 1,200 MW with total investment capital of VND 34,295, equaling USD 1.7 at My Loc Commune, Thai Thuy district, Thai Binh province, LISEMCO 2 JSC is in charge of fabrication of around 9000 tons of steel structure of Turbine house and Central control building of the plant....
Xem thêm
Tin nổi bật
-
Lễ hạ thủy tổ hợp Module chuyến 02 (Batch #4) dự...
Ngày 17/10/2024
-
Amecc tham gia Hội nghị kỷ niệm 20 năm ngày doanh nhân...
Ngày 13/10/2024
-
Tổ chức lễ kết nạp Đảng viên cho hai đồng chí...
Ngày 06/10/2024