Fabrication
-
AMECC MANUFACTURES SHIP SCRUBBERS
Ngày: 21-03-2020 | Lượt xem: 1060On 02/28/2020 AMECC handed over the second batch of Scrubbers at Hai Phong port to Bilfinger Engineering & Technologies GmbH.
Xem thêm
-
AMECC MANUFACTURES SCRUBBERS
Ngày: 26-06-2019 | Lượt xem: 1124Following a series of contract on manufacturing and fabrication for foreign projects, on 14 June 2019, AMECC Mechanical Construction Joint Stock Company signed a contract with Bilfinger Engineering & Technologies GmbH on manufacturing of Scrubbers.
Xem thêm
-
AMECC JSC WITH MOKA TANK PROJECT
Ngày: 22-09-2017 | Lượt xem: 1011Project: Moka Tank Owner: KOKELCO Contractor: ENEXIO – Federal Republic of Germany
Xem thêm
-
AMECC JSC HAS COMPLETED THE DINH RIVER DOWNSTREAM DAMP PROJECT
Ngày: 19-09-2017 | Lượt xem: 1177Project: Dinh River Downstream Dam project Location: Phan Rang – Thap Cham City and Ninh Phuoc district, Ninh Thuan Province. Owner: Water Resources Branch – Agriculture and Rural Development Department of Ninh Thuan Province Main contractor: Consortium of Southern Minerals Joint Stock Company No.389, Hassyu Vietnam Joint Stock Company and Bridge Joint Stock Company No.14.
Xem thêm
-
AMECC EXCELLENT COMPLETED THE WORK OF JIMAH EAST POWER PROJECT AS TIME SCHEDULE
Ngày: 11-09-2017 | Lượt xem: 1361On August 30, 2017, Amecc Mechanical Construction JSC exported the cargo of Jimah East power project.
Xem thêm
-
LG INNOTEK PLANT PROJECT IN HAI PHONG
Ngày: 11-02-2017 | Lượt xem: 1597WORK SCOPE OF AMECC: Fabrication and installation of steel structure for the whole plant...
Xem thêm
-
DUYEN HAI 3 EXTENSION THERMAL POWER PLANT PROJECT
Ngày: 09-02-2017 | Lượt xem: 1595WORK SCOPE OF AMECC: Fabrication of CW supply piping system. Fabrication of tanks, coal silos, ducts... ...
Xem thêm
-
NAMAN BRIDGE OF LAOS NR-6B ROAD PROJECT
Ngày: 08-02-2017 | Lượt xem: 1087WORK SCOPE OF AMECC: Fabrication, transportation and installation of Naman bridge in Sopbao village. ...
Xem thêm
-
CHANGI T2R PROJECT– CHANGI AIRPORT
Ngày: 08-02-2017 | Lượt xem: 978Work scope: Fabrication of passenger loading bridge for Changi airport...
Xem thêm
-
THAI BINH 2 COAL- FIRED THERMAL POWER PROJECT
Ngày: 07-02-2017 | Lượt xem: 937Work scope: Fabrication of steel structures of Turbine house and CCB. ...
Xem thêm
-
COMMENCEMENT CEREMONY FOR STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT
Ngày: 12-12-2016 | Lượt xem: 1127Yesterday, on September 19th, Lisemco 2 Joint Stock Company is solemnly organized a commencement ceremony for steel structure fabrication of turbine house and central controlling building belonging to Thai Binh 2 Thermal Power Project
Xem thêm
-
LISEMCO 2 SIGNED A CONTRACT ON FABRICATION WORK OF FORMOSA HA TINH PROJECT
Ngày: 12-12-2016 | Lượt xem: 847On 08/August/2013, LISEMCO 2 JSC signed contracts with Posco E & C Vietnam on steel structure fabrication work of the complex “Cast iron & steel plant and Son Duong deep-water port” Formosa- Ha Tinh.
Xem thêm
-
LISEMCO 2 URGENTLY COMPLETES STEEL STRUCTURE FABRICATION FOR THAI BINH 2 TPP PROJECT
Ngày: 12-12-2016 | Lượt xem: 1004Being the fabrication contractor of Thai Binh 2 thermal power plant with design capacity of 1.200 MW with total design capacity of 1,200 MW with total investment capital of VND 34,295, equaling USD 1.7 at My Loc Commune, Thai Thuy district, Thai Binh province, LISEMCO 2 JSC is in charge of fabrication of around 9000 tons of steel structure of Turbine house and Central control building of the plant.
Xem thêm
Tin nổi bật
-
-
AMECC JSC & BHI CO.,LTD CHÍNH THỨC KHỞI ĐỘNG DỰ ÁN "HRSG"...
Ngày 15/04/2025
-
-
Công ty Cổ phần Cơ khí Xây dựng AMECC Đón Tiếp...
Ngày 25/01/2025
-
-
Tiệc Sinh Nhật Tập Thể Tháng 1-2025 Tại Công Ty Cổ...
Ngày 15/01/2025